Air tank

  • 1
  • It is installed at the highest point of the central heating system.
  • Air bubbles formed in the hot water of the heating installation are thrown out with an automatic air purifier.

|Maximum operating pressure 10 bar |Maximum operating temperature 120 C |Pressure class PN 16 |Electrostatic powder coated

  • FEATURES

TEKNİK BİLGİLER

PRODUCT CODE CAPACITY DIMENSIONS
GSE-HT LT ØD H
GSE-HT-5 5 150 225
GSE-HT-10 10 200 260
GSE-HT-15 15 200 390
GSE-HT-20 20 300 240
GSE-HT-30 30 300 360
GSE-HT-40 40 300 480